Reply to thread

Also, as a secondary point, the roads and infastucture that would be needed is minimal, as the use of ice roads would move the heavy equipment into place and would be there until drilling is done and without permanent roads nor pipelines that would be necessary to bring equipment in and pump oil out.


Back
Top